Gimbal systems · complete payloads

CA121-powered gimbal systems for UAV integration.

Stabilized EO/IR payloads with long-range laser distance measurement, supplied as complete systems for OEM and unmanned platforms.

Choose a 30× 4K configuration, a 30× FHD configuration, or a lightweight 10× configuration. Validate payload fit, control interface, boresight, and mission conditions before design-in.

Discuss a gimbal system

Three complete configurations

Select the payload format for your platform.

Each configuration combines stabilized EO/IR imaging with the CA121 laser distance measurement module.

KTG-TT3001 stabilized EO/IR gimbal configuration

Flagship configuration

KTG-TT3001

  • 30× EO · 4K at 30 fps
  • IR 640 × 480 at 30 fps
  • 3-axis stabilization
  • 980 g · includes CA121
KTG-TT1001R stabilized EO/IR gimbal configuration

Balanced configuration

KTG-TT1001R

  • 30× EO · FHD
  • IR 640 × 480 at 30 fps
  • 3-axis stabilization
  • 835 g · includes CA121
KTG-TD3001B stabilized EO/IR gimbal configuration

Lightweight configuration

KTG-TD3001B

  • 10× EO
  • IR 640 × 480 at 30 fps
  • 3-axis stabilization
  • 482 g · includes CA121

Specification remarks: The 3,000 m LRF figure is Predustrial's stated range for these CA121-equipped gimbal systems. Effective range depends on target reflectivity, ambient light, atmosphere, optical alignment, and operating mode; qualify the integrated payload for its intended environment. Configuration weights include CA121.

System integration

Validate the payload in its host platform.

Confirm the physical and measurement setup together before design-in. The selected gimbal configuration and CA121 form one integrated payload system.

  • 01
    Mechanical fit

    Check mounting interface, available envelope, and clearances.

  • 02
    Mass properties

    Review payload weight and center of gravity against the host platform.

  • 03
    Boresight alignment

    Validate laser and EO/IR optical alignment for the intended measurement task.

  • 04
    Electrical and field validation

    Confirm power, control interface, operating conditions, and test plan.